HOME PORTFOLIO CONTACT INFO QUESTIONS
PORTFOLIO

125 IND COMPRESSORS 

OVERALL OBJECTIVE: To present information, explanations, demonstrate procedures and techniques, and provide instruction which enables program participants to operate, inspect and maintain the compressors and compressor systems at the work site.

DURATION: From 2 to 5 days of delivery depending on the COMPANY'S selection of compressor types, content and depth on content and hands-on practice.

TRAINING GUIDELINES: Delivered on site and covers all aspects of compressors, for tradespersons. Local COMPANY content with on site compressor equipment, situations and discussions.

The compressor systems program may include any or all of the following.

I. Introduction to the Principles Of Air
A. Basic Air Principles
B. Compressed Air
C. Basic Compressor Operation
II. Types Of Compressors
A. Compressor Basics
B. Sequence of Operation
C. Reciprocating and Rotary Compressors
D. Compressor Accessories
E. Heat Exchangers
F. Fans
G. Pressure Vessels
III. Safety
A. OSHA
B. Local Safety Concerns
IV. Equipment Isolation For Work
A. Local Isolation Items
B. Mechanical & Electrical Print
Reading & Review
V. Maintenance Procedures & Inspection Items
A. On Site Inspection Sheets &
Maintenance Procedures
B. Review/Edit of Inspection Sheets
C. Daily, Weekly, Monthly, Annual
Inspection Items
VI. Lubrication
A. On Site Types
B. Safe Handling
C. Inspecting & Changing Oils
VII. Filters
A. On Site Types
B. Inspection
C. Filter Changes

VIII. Intercoolers and Aftercoolers
A. Cooling System Operation
B. Inspection & Maintenance

IX. Unloading Systems & Dump Valves
A. On Site Types
B. Operation
C. Inspection & Maintenance

X. Compressor Valves
A. On Site Inspection
B. Changing or Rebuilding if Applicable

XI. Drives/Belts
A. Inspection
B. Changing
C. Alignment

XII. Troubleshooting
A. Operator Annunciation's
B. Alarms & Trips
B. Mechanical/Electrical Problems

XIII. Instrument Air Dryers
A. Purpose
B. On Site Types
C. Operation
C. Inspection & Switching

XIV. Relief Valves/Receiver Tanks
A. General/Local Rules and Procedures

XV. Gauges/Switches
A. Calibrating and Checking as Required On Site

XVI. Compressor Piston, Rings, Bearings
A. Inspection/Maintenance

VII. Filters
D. On Site Types
E. Inspection
F. Filter Changes




Select here to Request Further Information about this item

Return to PORTFOLIO


Jeffrey Stewart c/o Energy Transfer Technology, Inc.
P.O. Box 2088 ,
26 Whitman Lane,
Wellfleet ,
Massachusetts,
02667
United States of America
Tel: 1 (508) 349-9781
Fax: 1(508) 349-3298
Built using ecBuilder.